How to fill out an AS9102 First Article Inspection Report with Excel
As9102 Form 3. Characteristic accountability, verification and compatibility evaluation shall be used to record an actual measurement or inspection/verification of the fai part for every design characteristic on the drawing, including notes. Web delta fai design change significant change in the method of manufacture e.g.
How to fill out an AS9102 First Article Inspection Report with Excel
Utilize the tools we provide to fill out your document. Characteristic accountability, verification and compatibility evaluation important: How to modify and esign form as9102 sample without breaking a sweat. Tooling, processes, location, machine, numerical control program, sequence of manufacture fai submission requirements each fai must include the following: Part number accountability o as9102 form 2: Data fields 1 thru 4 are repeated on all forms for convenience and traceability. If you don’t have this form, you can download it by clicking on the link below. Web delta fai design change significant change in the method of manufacture e.g. Web o as9102 form 1: As9102 first articles used by the aerospace and defense industries include 3 forms:
Web an as9102 fair, or first article inspection report, certifies that each sample was produced and inspected according to the customer's specifications. This article is a detailed example of how to fill out all 3 forms of the as9102 first article inspection report. Completed as9102 forms 1, 2 & 3 (equivalent forms permitted) complete bubbled print certification of conformance Part number accountability o as9102 form 2: If you don’t have this form, you can download it by clicking on the link below. Learn more about as9102 and download a free as9102 rev b template and this guide as a pdf. Please download our free as9102 first article inspection forms (as9102 rev. Web o as9102 form 1: Data fields 1 thru 4 are repeated on all forms for convenience and traceability. Tooling, processes, location, machine, numerical control program, sequence of manufacture fai submission requirements each fai must include the following: Web form 3 characteristic accountability, verification, and compatibility evaluation additional documentation must also be supplied when referenced in the fair, such as balloon drawings, certificates of conformance, material certificates, special.